It’s been a busy Saturday at Linda Community School. An overflowing septic tank was dealt with so that school can open as usual on Monday, our metalworker Michael was doing various repairs, repainting began on the insides of the ablution blocks, and work began on the walls of the new insaka using eco-bricks (plastic bottles stuffed with rubbish). Work on the school doesn’t stop for the weekend!